2014 Langer Bear Creek Project
This project fenced off 8.63 miles of Bear Creek and excluded livestock from their traditional water sources. Two springs were developed to provide stockwater for the pastures created by the riparian fencing.
This project fenced off 8.63 miles of Bear Creek and excluded livestock from their traditional water sources. Two springs were developed to provide stockwater for the pastures created by the riparian fencing.